Wind farm tests
Language: English Series: Independent ; 17/3/89 p6Publication details: 1989Subject(s): Summary: Britain`s first full-scale wind power farm is to begin testing at Capel Cynon at Dyfed. It is one of three sites chosen by the CEGB for wind farms, which will cost about £9m each to construct.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2512-24 (Browse shelf(Opens below)) | 1 | Available | 31265-1001 |
Britain`s first full-scale wind power farm is to begin testing at Capel Cynon at Dyfed. It is one of three sites chosen by the CEGB for wind farms, which will cost about £9m each to construct.