Image from Google Jackets

Wind farm tests

Language: English Series: Independent ; 17/3/89 p6Publication details: 1989Subject(s): Summary: Britain`s first full-scale wind power farm is to begin testing at Capel Cynon at Dyfed. It is one of three sites chosen by the CEGB for wind farms, which will cost about £9m each to construct.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2512-24 (Browse shelf(Opens below)) 1 Available 31265-1001

Britain`s first full-scale wind power farm is to begin testing at Capel Cynon at Dyfed. It is one of three sites chosen by the CEGB for wind farms, which will cost about £9m each to construct.