French race for tunnel service
Language: English Series: Independent ; 19 May 1993, 2(1)Publication details: 1993Subject(s): Summary: A preliminary section of the planned railway line connecting Paris to the Channel Tunnel has been completed.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2919-35 (Browse shelf(Opens below)) | 1 | Available | 31545-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2919-32 Facilities management | WB2919-33 Keep lifts in check | WB2919-34 Building hopes on recovery | WB2919-35 French race for tunnel service | WB2919-36 The intelligent car | WB2919-37 US housing starts rise by 6.7% | WB2919-38 Chile |
A preliminary section of the planned railway line connecting Paris to the Channel Tunnel has been completed.