Beaufort House Developments Ltd v Zimmcor (International) Inc and others

Language: English Series: Construction Industry Law Letter ; (1990) CILL 572-573(2)Publication details: 1990Subject(s): Summary: ORC 12 March 1990. Claim for damages and loss incurred by the client (BF) as a result of the first defendant`s (Z) failure to complete. Claim made under a Trade Contract widely used on the Broadgate development, not in one of the well known standard forms, but with some similarities to the JCT main contract. Z was trade contractor for curtain walling , cladding , windows and doors and Bovis Construction (B) was the construction manager and under the trade contract had powers similar but not identical to those of the architect under JCT 1980 . Clause 19(1) of the contract provided that the works were to be commenced on the site "within the period stated in the programme from the date of B`s instruction to proceed...and that Z must complete the works...within the periods for completion...stated in the programme, subject to any extensions of time granted by B. Clause 19(3) stated if Z is in breach of any of his obligations under 19(1) he shall ... forthwith pay or allow the client such
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article ABS42619 (Browse shelf(Opens below)) 1 Available 37893-1001

ORC 12 March 1990. Claim for damages and loss incurred by the client (BF) as a result of the first defendant`s (Z) failure to complete. Claim made under a Trade Contract widely used on the Broadgate development, not in one of the well known standard forms, but with some similarities to the JCT main contract. Z was trade contractor for curtain walling , cladding , windows and doors and Bovis Construction (B) was the construction manager and under the trade contract had powers similar but not identical to those of the architect under JCT 1980 . Clause 19(1) of the contract provided that the works were to be commenced on the site "within the period stated in the programme from the date of B`s instruction to proceed...and that Z must complete the works...within the periods for completion...stated in the programme, subject to any extensions of time granted by B. Clause 19(3) stated if Z is in breach of any of his obligations under 19(1) he shall ... forthwith pay or allow the client such