Management contracting
Language: English Series: Building Trades Journal ; vol 194 no 5713 9/7/87 p4Publication details: 1987Subject(s): Summary: A guidance note from the Health and Safety Commission , Managing health and safety in construction Part II, due to be published later this year, concentrates on management contracting which can pose grave health and safety risks through poor planning, lack of co-ordination and lax control on site.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2327-06 (Browse shelf(Opens below)) | 1 | Available | 39202-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2327-02 CLA handbook | WB2327-03 Forests suffering from acid rain | WB2327-05 Housebuilding | WB2327-06 Management contracting | WB2327-07 NEDO cutbacks | WB2327-08 Setting-off claims | WB2327-09 Debenham Tewson plans float |
A guidance note from the Health and Safety Commission , Managing health and safety in construction Part II, due to be published later this year, concentrates on management contracting which can pose grave health and safety risks through poor planning, lack of co-ordination and lax control on site.