Concise building cost analysis
Language: English Series: Surveyor (Institution of Surveyors` Malaysia) ; 25(2) 2nd Quarter 1990, 19-27(9)Publication details: 1990Subject(s): Summary: Cost analysis for an office building and for a research building; plus cost of materials and labour in Malaysia .| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS43159 (Browse shelf(Opens below)) | 1 | Available | 40605-1001 |
Cost analysis for an office building and for a research building; plus cost of materials and labour in Malaysia .