High tech growth in Cambridge
Language: English Series: Planning (for the Natural and Built Environment) ; no 802, 20/1/89 p7Publication details: 1989Subject(s): Summary: A draft development strategy for industrial growth in the Cambridge region has been produced by consultants at Cambridge University. Prime targets for the controlled dispersal of such growth have been identified as Ely, St Neots, Ramsey, Chatteris, March and Haverhill.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2504-29 (Browse shelf(Opens below)) | 1 | Available | 42177-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
A draft development strategy for industrial growth in the Cambridge region has been produced by consultants at Cambridge University. Prime targets for the controlled dispersal of such growth have been identified as Ely, St Neots, Ramsey, Chatteris, March and Haverhill.