Image from Google Jackets

Payment clause that failed

By: Language: English Series: Construction News ; (6197) 17 January 1991, 11(1)Publication details: 1991Subject(s): Summary: Reports on A Cameron Ltd v John Mowlem plc (1989) in which the adjudication provisions in DOM/1 , aimed at protecting subcontractors from excessive deductions from their payments by way of set off , were found to be ineffective.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS43909 (Browse shelf(Opens below)) 1 Available 44229-1001

Reports on A Cameron Ltd v John Mowlem plc (1989) in which the adjudication provisions in DOM/1 , aimed at protecting subcontractors from excessive deductions from their payments by way of set off , were found to be ineffective.