Two days in the life of a mediator
Language: English Series: CSM (Chartered Surveyor Monthly) ; 3(9) June 1994, 48-49(2)Publication details: 1994Subject(s): Summary: Case study of a construction industry mediation used in a substantial dispute between main contractor and a subcontractor on a building project.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS50782 (Browse shelf(Opens below)) | 1 | Available | 44843-1001 |
Case study of a construction industry mediation used in a substantial dispute between main contractor and a subcontractor on a building project.