Image from Google Jackets

Construction contractor`s claims analysis: an integrated system approach

By: Contributor(s): Language: English Series: Building ; Research and Information 19(1) January-February 19Subject(s): Summary: Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS44492 (Browse shelf(Opens below)) 1 Available 47472-1001

Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.