Computer and Systems Engineering plc v John Lelliott (Ilford) Limited and another

Language: English Series: Construction Industry Law Letter ; 1991 CILL 673-675(3)Publication details: 1991Subject(s): Summary: CA 5 December 1990. A company C employed another company J to carry out alteration and fitting out works for them. The main contract was JCT 1980 Private edition without quantities . Part of the work involved installing 140 steel purlins in and the work was subcontracted to S under a similar contract. During the work a purlin fell breaking a pipe forming part of the fire protection sprinkler system . This discharged 1,600 gallons of water which seeped through the floor onto C`s property stored below causing £164,000 of damage. C claimed damages and interest from J and S. It was claimed this loss arose from a peril which under JCT 1980 clause 22C of the main contract was C`s sole risk. However the judge held that the event in question was not a clause 22 peril. S appealed, this was dismissed as the event did not constitute a ` flood ` or `bursting and overflowing` within the meaning of the clause.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article ABS44624 (Browse shelf(Opens below)) 1 Available 48069-1001

CA 5 December 1990. A company C employed another company J to carry out alteration and fitting out works for them. The main contract was JCT 1980 Private edition without quantities . Part of the work involved installing 140 steel purlins in and the work was subcontracted to S under a similar contract. During the work a purlin fell breaking a pipe forming part of the fire protection sprinkler system . This discharged 1,600 gallons of water which seeped through the floor onto C`s property stored below causing £164,000 of damage. C claimed damages and interest from J and S. It was claimed this loss arose from a peril which under JCT 1980 clause 22C of the main contract was C`s sole risk. However the judge held that the event in question was not a clause 22 peril. S appealed, this was dismissed as the event did not constitute a ` flood ` or `bursting and overflowing` within the meaning of the clause.