The importance of timing
Language: English Series: Estates Gazette ; (9146) 23 November 1991, 165(1)Publication details: 1991Subject(s): Summary: Notes the importance of professional knowledge with reference to the "Corfield v Bosher & Co" 1989, where the surveyor wrongly thought that the time limit for challenging an arbitration award was six weeks.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2746-01 (Browse shelf(Opens below)) | 1 | Available | 50250-1001 |
Notes the importance of professional knowledge with reference to the "Corfield v Bosher & Co" 1989, where the surveyor wrongly thought that the time limit for challenging an arbitration award was six weeks.