All steamed up
Language: English Series: Building ; 256(7724) 6 December 1991, 70-71(2)Publication details: 1991Subject(s): Summary: Examines criticism of the fully bedded method of double glazing as specified in BS6262 and specific complaints of faulty double glazing at Barratt`s Dulwich Gate estate, where an unsuitable linseed oil putty was used.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS45544 (Browse shelf(Opens below)) | 1 | Available | 53656-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Examines criticism of the fully bedded method of double glazing as specified in BS6262 and specific complaints of faulty double glazing at Barratt`s Dulwich Gate estate, where an unsuitable linseed oil putty was used.