Project budgeting for buildings
Language: English Series: Cost Engineering ; 36(12) December 1994, 13-18(6)Publication details: 1994Subject(s): Summary: Describes a methodology to prepare a complete project budget based on design program data, criteria, design parameters and level of quality desired by the owner. It explains how this is possible prior to hiring an architect and why budgets developed using this system are more effective for cost control. (US practice)| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS52041 (Browse shelf(Opens below)) | 1 | Available | 56145-1001 |
Describes a methodology to prepare a complete project budget based on design program data, criteria, design parameters and level of quality desired by the owner. It explains how this is possible prior to hiring an architect and why budgets developed using this system are more effective for cost control. (US practice)