Image from Google Jackets

Total costs and global claims

By: Language: English Series: International Construction Law Review ; 12(4) October 1995, 531-560(30)Publication details: 1995Subject(s): Summary: Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS53682 (Browse shelf(Opens below)) 1 Available 5876-1001

Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.