Total costs and global claims
Language: English Series: International Construction Law Review ; 12(4) October 1995, 531-560(30)Publication details: 1995Subject(s): Summary: Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS53682 (Browse shelf(Opens below)) | 1 | Available | 5876-1001 |
Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.