Channel changer
Language: English Series: Building ; 257(7747) 29 May 1992, 38-42(5)Publication details: 1992Subject(s): Summary: Cheriton terminal for the Channel Tunnel is being designed as it is being built, thus creating enormous demands for the construction team and cost consultants. This article reports on the design, costing, planning and environmental impact of the terminal`s erection and the claims arising from it.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS46341 (Browse shelf(Opens below)) | 1 | Available | 57890-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| ABS46337 Self starter homes | ABS46338 Choosing your colors | ABS46340 Arch arrival | ABS46341 Channel changer | ABS46342 Epic journey | ABS46343 Launching the Ark | ABS46344 The Garden House |
Cheriton terminal for the Channel Tunnel is being designed as it is being built, thus creating enormous demands for the construction team and cost consultants. This article reports on the design, costing, planning and environmental impact of the terminal`s erection and the claims arising from it.