Times of change
Language: English Series: New Builder ; 23 July 1992, 23(1)Publication details: 1992Subject(s): Summary: Briefly identifies the main procurement methods currently favoured within the UK construction industry including construction management, design and build and traditional contracts such as JCT 1980.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS46689 (Browse shelf(Opens below)) | 1 | Available | 59202-1001 |
Briefly identifies the main procurement methods currently favoured within the UK construction industry including construction management, design and build and traditional contracts such as JCT 1980.