Evidence of non-repair
Language: English Series: Times ; 16 July 1992, LT18(1)Publication details: 1992Subject(s): Summary: In "Pritchard v Clwyd CC and another", CA 16 June 1992, it was held that flood water collecting in a road following heavy rainfall was not of itself evidence of non-repair or lack of maintenance of the highway or sewers.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Law report | London Journal article | WB2828-35 (Browse shelf(Opens below)) | 1 | Available | 59819-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2827-31 Ambiguous enforcement notice | WB2827-45 Premises test for capital allowances | WB2828-13 Contract terms | WB2828-35 Evidence of non-repair | WB2828-36 Right of entry | WB2828-47 Letter did not create tenancy | WB2828-60 Change of use |
In "Pritchard v Clwyd CC and another", CA 16 June 1992, it was held that flood water collecting in a road following heavy rainfall was not of itself evidence of non-repair or lack of maintenance of the highway or sewers.