| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2925-06 (Browse shelf(Opens below)) | 1 | Available | 62756-1001 |
Davis Langdon & Everest report a 7% increase in tender costs in 2Q93; the building cost index rose by only 0.5% in the same period.