Language: English Series: Chartered Surveyor Weekly ; 40(4) 23 July 1992, 47(2)Publication details: 1992Subject(s): Summary: "Tokola Project Services Ltd and High Force Engineering Co Ltd v NV Victor Buyck and Victor Buyck Ltd" HC 25 July 1992. The court had to determine, which defendant was responsible in the action. The problem in identification was caused by failure to formalise contractual arrangements at the time.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article WB2829-06 (Browse shelf(Opens below)) 1 Available 63583-1001

"Tokola Project Services Ltd and High Force Engineering Co Ltd v NV Victor Buyck and Victor Buyck Ltd" HC 25 July 1992. The court had to determine, which defendant was responsible in the action. The problem in identification was caused by failure to formalise contractual arrangements at the time.