ICE Design and Construct conditions

By: Language: English Series: Chartered Quantity Surveyor ; 15(6) February 1993, 20(1)Publication details: 1993Subject(s): Summary: Guide to the principal clauses of the ICE Design and Construct conditions of contract, where contractor is responsible for both design and build. Similarities with the ICE condition 6th edition are noted.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS47968 (Browse shelf(Opens below)) 1 Available 64235-1001

Guide to the principal clauses of the ICE Design and Construct conditions of contract, where contractor is responsible for both design and build. Similarities with the ICE condition 6th edition are noted.