Image from Google Jackets

How to use the SFA/92

By: Language: English Series: Architects` Journal ; 197(12) 24 March 1993, 30-32(3)Publication details: 1993Subject(s): Summary: Analyses the clauses and schedules of the three separate types of appointment under the latest Standard Form of Agreement, when a traditional procurement route is followed, when the architect is engaged by the employer in connection with design and build and when the architect is engaged by the contractor in connection with design and build.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS48152 (Browse shelf(Opens below)) 1 Available 65247-1001

Analyses the clauses and schedules of the three separate types of appointment under the latest Standard Form of Agreement, when a traditional procurement route is followed, when the architect is engaged by the employer in connection with design and build and when the architect is engaged by the contractor in connection with design and build.