Image from Google Jackets

Tussling over float and contingencies

By: Language: English Series: Building ; 258(7784) 5 March 1993, 28-29(2)Publication details: 1993Subject(s): Summary: Considers the contractual effect of `float` inserted by contractors during or at the end of their construction programmes and how it should be accommodated in considering extensions of time.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS48159 (Browse shelf(Opens below)) 1 Available 65276-1001

Considers the contractual effect of `float` inserted by contractors during or at the end of their construction programmes and how it should be accommodated in considering extensions of time.