Image from Google Jackets

Design and construct forms latest strategy

By: Language: English Series: Construction News ; (6480) 2 February 1995, 12-13(1)Publication details: 1995Subject(s): Summary: Marks the launch, for consultation, of the FIDIC "Conditions of contract for design-build and turnkey" (the Orange Book). It dispenses with the traditional term `engineer` replacing it with `an employer`s representative` and requires the contractor to take out professional indemnity insurance to cover his design liability.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS52232 (Browse shelf(Opens below)) 1 Available 67085-1001

Marks the launch, for consultation, of the FIDIC "Conditions of contract for design-build and turnkey" (the Orange Book). It dispenses with the traditional term `engineer` replacing it with `an employer`s representative` and requires the contractor to take out professional indemnity insurance to cover his design liability.