Design and construct forms latest strategy
Language: English Series: Construction News ; (6480) 2 February 1995, 12-13(1)Publication details: 1995Subject(s): Summary: Marks the launch, for consultation, of the FIDIC "Conditions of contract for design-build and turnkey" (the Orange Book). It dispenses with the traditional term `engineer` replacing it with `an employer`s representative` and requires the contractor to take out professional indemnity insurance to cover his design liability.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS52232 (Browse shelf(Opens below)) | 1 | Available | 67085-1001 |
Marks the launch, for consultation, of the FIDIC "Conditions of contract for design-build and turnkey" (the Orange Book). It dispenses with the traditional term `engineer` replacing it with `an employer`s representative` and requires the contractor to take out professional indemnity insurance to cover his design liability.