Image from Google Jackets

To what extent are a sub-contractor`s obligations under BEC sub-contract DOM/2 back to back with those of the main contractor under JCT with contractors design 1981?

By: Language: English Series: Construction Law Journal ; 9(2) 1993, 101-107(7)Publication details: 1993Subject(s): Summary: Considers how JCT with contractors design 1981 and DOM/2 allocate responsibility for problems between the employer, contractor and the subcontractor.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS48541 (Browse shelf(Opens below)) 1 Available 67297-1001

Considers how JCT with contractors design 1981 and DOM/2 allocate responsibility for problems between the employer, contractor and the subcontractor.