To what extent are a sub-contractor`s obligations under BEC sub-contract DOM/2 back to back with those of the main contractor under JCT with contractors design 1981?
Language: English Series: Construction Law Journal ; 9(2) 1993, 101-107(7)Publication details: 1993Subject(s): Summary: Considers how JCT with contractors design 1981 and DOM/2 allocate responsibility for problems between the employer, contractor and the subcontractor.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS48541 (Browse shelf(Opens below)) | 1 | Available | 67297-1001 |
Considers how JCT with contractors design 1981 and DOM/2 allocate responsibility for problems between the employer, contractor and the subcontractor.