What to do about architects, time extensions and culpable delays
Language: English Series: Construction News ; (6513) 6 May 1993, 16(1)Publication details: 1993Subject(s): Summary: With reference to "Balfour Beatty Ltd v Chestermount", examines whether the architect has power to issue a new variation order during a period of delay for which the contractor is responsible, and if so when does the extension run from?| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS48542 (Browse shelf(Opens below)) | 1 | Available | 67301-1001 |
With reference to "Balfour Beatty Ltd v Chestermount", examines whether the architect has power to issue a new variation order during a period of delay for which the contractor is responsible, and if so when does the extension run from?