Bridging the river, again
Language: English Series: Western Mail ; 20 August 1992, 12(1)Publication details: 1992Subject(s): Summary: A second crossing of the River Severn is underway, with initial work on the 5km bridge having started in April.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2832-10 (Browse shelf(Opens below)) | 1 | Available | 68288-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2832-07 Green design cuts running costs | WB2832-08 Radon reduction | WB2832-09 BREEAM assessment | WB2832-10 Bridging the river, again | WB2832-100 Industry views on carbon tax | WB2832-101 Proposal seeks to spread road costs | WB2832-102 Partnership in the cities |
A second crossing of the River Severn is underway, with initial work on the 5km bridge having started in April.