Time limit on liability
Language: English Series: CSW - The Property Week ; 45(7) 18 November 1993, 63(1)Publication details: 1993Subject(s): Summary: The contractor is only responsible for faults which appear in design or construction within six years in the UK but the EC is looking at five or ten years.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2943-06 (Browse shelf(Opens below)) | 1 | Available | 71918-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2943-03 Building sector shrinking | WB2943-04 New ideas increase profits | WB2943-05 Bond guidelines | WB2943-06 Time limit on liability | WB2943-07 Industrial buildings environmental scheme | WB2943-08 Underpinning | WB2943-09 New fire regulations |
The contractor is only responsible for faults which appear in design or construction within six years in the UK but the EC is looking at five or ten years.