Speeding up plan inquiries
Language: English Series: Planning (for the Natural and Built Environment) ; (1044) 12 November 1993, 4(1)Publication details: 1993Subject(s): Summary: There can be no substantial reductions in the length or cost of local plan inquiries unless there are fundamental changes to the rules according to research published by the DoE.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2943-43 (Browse shelf(Opens below)) | 1 | Available | 72072-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB2943-40 Gamble on Mexico | WB2943-41 Land rights bill | WB2943-42 Target Hong Kong | WB2943-43 Speeding up plan inquiries | WB2943-44 Wind farm policy guidance | WB2943-47 Hire and fire | WB2943-48 ISVA name change |
There can be no substantial reductions in the length or cost of local plan inquiries unless there are fundamental changes to the rules according to research published by the DoE.