Image from Google Jackets

Standard reduces quality claim

Language: English Series: New Builder ; no 20, 8/2/90 p6Publication details: 1990Subject(s): Summary: The property developer Stanhope has removed from all its contracts a clause which stipulates that contractors must comply with the quality standard BS 5750 , claiming that quality on site is being reduced rather than raised.
Holdings
Item type Current library Call number Copy number Status Barcode
News article London News article WB2607-04 (Browse shelf(Opens below)) 1 Available 75129-1001

The property developer Stanhope has removed from all its contracts a clause which stipulates that contractors must comply with the quality standard BS 5750 , claiming that quality on site is being reduced rather than raised.