Heathrow tunnel collapse
Language: English Series: Building ; 259(7866) 28 October 1994, 8(1)Publication details: 1994Subject(s): Summary: Discusses the investigation into the collapse of underground workings at Heathrow airport, highlighting the use of the New Austrian Tunnelling Method, the New Engineering Contract and delays to the Jubilee Line extension.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3040-09 (Browse shelf(Opens below)) | 1 | Available | 75591-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3040-06 JCT contracts | WB3040-07 Performance bonds | WB3040-08 Whole life costing | WB3040-09 Heathrow tunnel collapse | WB3040-10 Hong Kong airport | WB3040-11 Autumn investment low | WB3040-12 Brewing industry |
Discusses the investigation into the collapse of underground workings at Heathrow airport, highlighting the use of the New Austrian Tunnelling Method, the New Engineering Contract and delays to the Jubilee Line extension.