Tunnelling method
Language: English Series: Financial Times ; 8 November 1994, 8; 11 November 1994, 9 | Construction News ; (6390) 8 November 1994, 1&40(2)Publication details: 1994Subject(s): Summary: London Underground is to hold its own inquiry into the new `Austrian` tunnelling method which is being investigated by the Health and Safety Executive following collapse of a tunnel under construction at Heathrow Airport.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3042-06 (Browse shelf(Opens below)) | 1 | Available | 76284-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3042-03 Assessment on quality | WB3042-04 Clients rethink procurement | WB3042-05 Clients unaware of Latham Report | WB3042-06 Tunnelling method | WB3042-07 Delayed recovery | WB3042-08 Green is good | WB3042-09 Property in business |
London Underground is to hold its own inquiry into the new `Austrian` tunnelling method which is being investigated by the Health and Safety Executive following collapse of a tunnel under construction at Heathrow Airport.