Image from Google Jackets

Fitting in fitting-out

By: Language: English Series: Building ; 250(23) 6 June 1986, 49-50(2)Publication details: 1986Subject(s): Summary: In the construction of London Bridge City the construction management system has allowed the fitting out works to be incorporated in the original shell and core building programme, saving approximately 11 months on the overall project timetable.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS36400 (Browse shelf(Opens below)) 1 Available 77717-1001

In the construction of London Bridge City the construction management system has allowed the fitting out works to be incorporated in the original shell and core building programme, saving approximately 11 months on the overall project timetable.