Best practice with the New Engineering Contract
Language: English Series: Proceedings of the Institution of Civil Engineers ; 120(2) May 1997, 74-81(8)Publication details: 1997Subject(s): Summary: Presents results of research carried out by the University of Birmingham into the use of the New Engineering Contract. Discusses desirable changes in the contract process and summarises the benefits that use of the NEC has produced. References.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS56938 (Browse shelf(Opens below)) | 1 | Available | 78266-1001 |
Presents results of research carried out by the University of Birmingham into the use of the New Engineering Contract. Discusses desirable changes in the contract process and summarises the benefits that use of the NEC has produced. References.