Image from Google Jackets

Best practice with the New Engineering Contract

By: Language: English Series: Proceedings of the Institution of Civil Engineers ; 120(2) May 1997, 74-81(8)Publication details: 1997Subject(s): Summary: Presents results of research carried out by the University of Birmingham into the use of the New Engineering Contract. Discusses desirable changes in the contract process and summarises the benefits that use of the NEC has produced. References.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS56938 (Browse shelf(Opens below)) 1 Available 78266-1001

Presents results of research carried out by the University of Birmingham into the use of the New Engineering Contract. Discusses desirable changes in the contract process and summarises the benefits that use of the NEC has produced. References.