EC Harris cost index
Language: English Series: Construction News ; (6535) 2 October 1997, 18 (1)Publication details: 1997Subject(s): Summary: The increase in contractors` input costs which began last quarter continued into the third quarter, according to the EC Harris/Construction News contractors` input cost index.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3338-03 (Browse shelf(Opens below)) | 1 | Available | 81204-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3337-45 Coventry and Warwickshire | WB3338-01 Arts fail internet | WB3338-02 Construction orders blip | WB3338-03 EC Harris cost index | WB3338-04 Public sector construction contracts | WB3338-05 Whole-life costs | WB3338-06 MDF safety hazard |
The increase in contractors` input costs which began last quarter continued into the third quarter, according to the EC Harris/Construction News contractors` input cost index.