Cost study
Language: English Series: Building ; 262(8008) 26 September 1997, 60-65(6)Publication details: 1997Subject(s): Summary: A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS57701 (Browse shelf(Opens below)) | 1 | Available | 81290-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| ABS57698 The magic formula | ABS57699 Value judgement | ABS57700 Cost model: museums and galleries | ABS57701 Cost study | ABS57702 Reduced rate | ABS57703 Design faults | ABS57704 Curtain call |
A new monthly series giving detailed cost commentaries of recent projects. This issue looks at the refurbishment/redevelopment of a grade-I listed bank and an adjacent 1960s tower block in Manchester. Includes an elemental cost analysis.