Reduced rate
Language: English Series: New Civil Engineer ; 2 October 1997, 18(1)Publication details: 1997Subject(s): Summary: Looks at the amount of waste the construction industry generates each year and at the research CIRIA is doing to seek a remedy. Calculates the cost of waste.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS57702 (Browse shelf(Opens below)) | 1 | Available | 81603-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| ABS57699 Value judgement | ABS57700 Cost model: museums and galleries | ABS57701 Cost study | ABS57702 Reduced rate | ABS57703 Design faults | ABS57704 Curtain call | ABS57705 Reception areas |
Looks at the amount of waste the construction industry generates each year and at the research CIRIA is doing to seek a remedy. Calculates the cost of waste.