Retrospective contracts and the pitfalls they hold
Language: English Series: Contract Journal ; 392(6168) 25 March 1998, 24(1)Publication details: 1998Subject(s): Summary: Considers the effect of a contract entered into after works have already been carried out in "Trollope & Colls and Holland Hannen and Cubitts v Atomic Power Constructions Ltd".| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS58391 (Browse shelf(Opens below)) | 1 | Available | 85311-1001 |
Considers the effect of a contract entered into after works have already been carried out in "Trollope & Colls and Holland Hannen and Cubitts v Atomic Power Constructions Ltd".