The five commandments of construction project delay analysis
Language: English Series: Cost Engineering ; 40(4) April 1998, 37-41(5)Publication details: 1998Subject(s): Summary: Presents a formal procedure to follow in the analysis of why a delay has occurred on a construction project. Suggests methods of data gathering and analysis, identification of the root cause, classification of the type of delay, and assignment of responsibility.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS58785 (Browse shelf(Opens below)) | 1 | Available | 86252-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Presents a formal procedure to follow in the analysis of why a delay has occurred on a construction project. Suggests methods of data gathering and analysis, identification of the root cause, classification of the type of delay, and assignment of responsibility.