Image from Google Jackets

Dealing with defects: defective owner provided preliminary design in design-build contracting

By: Language: English Series: International Construction Law Review ; 15(2) April 1998, 193-210(18)Publication details: 1998Subject(s): Summary: Considers one aspect of dispute avoidance in design-build contracting; the allocation and management of the risk of defects in the preliminary design prepared by the owner or its consultant and included as a part of the owner`s requirements in a competitively-bid, fixed price, design-build contract. Includes case study. References.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS58833 (Browse shelf(Opens below)) 1 Available 87054-1001

Considers one aspect of dispute avoidance in design-build contracting; the allocation and management of the risk of defects in the preliminary design prepared by the owner or its consultant and included as a part of the owner`s requirements in a competitively-bid, fixed price, design-build contract. Includes case study. References.