Egan sets tough targets
Language: English Series: Building ; 263(27) 3 July 1998, 7(1)Publication details: 1998Subject(s): Summary: Construction taskforce is to set the following six targets for the industry: 20% improvement in predictability; 20% cut in defects; 20% reduction in accidents; 10% improvements in time taken for projects; 10% reduction in costs and 10% improvement in industry productivity.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB3426-02 (Browse shelf(Opens below)) | 1 | Available | 87246-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| WB3425-68 Planning for the future | WB3425-69 FIG `98 | WB3426-01 Construction output | WB3426-02 Egan sets tough targets | WB3426-03 Tax law change | WB3426-04 Procurement watchdogs | WB3426-05 Tender prices |
Construction taskforce is to set the following six targets for the industry: 20% improvement in predictability; 20% cut in defects; 20% reduction in accidents; 10% improvements in time taken for projects; 10% reduction in costs and 10% improvement in industry productivity.