What does a programme mean?

By: Language: English Series: Building Trades Journal ; 194(5723) 17 September 1987, 17-18(2)Publication details: 1987Subject(s): Summary: A requirement of JCT 1980 clause 5.3.1.2 is that the contractor must provide the architect with a master programme of works. There is no such stipulation with IFC 84 and MW 80. in this article the author addresses the question of whether the provision of a programme has any legal significance for the contract as a whole.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS38139 (Browse shelf(Opens below)) 1 Available 8889-1001

A requirement of JCT 1980 clause 5.3.1.2 is that the contractor must provide the architect with a master programme of works. There is no such stipulation with IFC 84 and MW 80. in this article the author addresses the question of whether the provision of a programme has any legal significance for the contract as a whole.