Image from Google Jackets

Cost model

Language: English Series: Building ; 263(8047) 10 July 1998, 56-63(8)Publication details: 1998Subject(s): Summary: Reviews the design, the availability of lottery funding and the cost of smaller sports buildings. Includes references, cost breakdown, plan and alternative element specifications.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS59003 (Browse shelf(Opens below)) 1 Available 87503-1001

Reviews the design, the availability of lottery funding and the cost of smaller sports buildings. Includes references, cost breakdown, plan and alternative element specifications.