A case of timely importance
Language: English Series: Contract Journal ; 378(6020) 13 April 1995, 14(1)Publication details: 1995Subject(s): Summary: Examines "Aries Powerplant Ltd v ECE Systems Ltd" (1995), in which the plaintiff sought to show that time was of the essence in a contract for the supply and installation of diesel tanks.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS52648 (Browse shelf(Opens below)) | 1 | Available | 88520-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Examines "Aries Powerplant Ltd v ECE Systems Ltd" (1995), in which the plaintiff sought to show that time was of the essence in a contract for the supply and installation of diesel tanks.