Image from Google Jackets

Passing the liability parcel

By: Language: English Series: Building ; 263(8059) 9 October 1998, 72-73(2)Publication details: 1998Subject(s): Summary: Claims that as the idea of integrated working on construction contracts gains ground, all parties stand greater risk of being drawn into litigation. Suggests that a shared approach may be the answer.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS59394 (Browse shelf(Opens below)) 1 Available 89276-1001

Claims that as the idea of integrated working on construction contracts gains ground, all parties stand greater risk of being drawn into litigation. Suggests that a shared approach may be the answer.