Cost update
Language: English Series: Building ; 263(8065) 20 November 1998, 67-69(3)Publication details: 1998Subject(s): Summary: A quarterly analysis of changes to materials prices and labour rates, prepared by Davis Langdon & Everest, together with a focus on waterproofing and the latest wage rate agreements.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS59599 (Browse shelf(Opens below)) | 1 | Available | 89857-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| ABS59596 The ultimate deterrent | ABS59597 What can adjudicators do? | ABS59598 A matter of interest | ABS59599 Cost update | ABS59600 Could it be you? | ABS59601 Cost study | ABS59602 Frame future |
A quarterly analysis of changes to materials prices and labour rates, prepared by Davis Langdon & Everest, together with a focus on waterproofing and the latest wage rate agreements.