Cost model: urban commercial offices
Language: English Series: Building Services Journal ; February 1999, 13-15(3)Publication details: 1999Subject(s): Summary: An analysis of cost and specification information relating to mechanical and electrical installations for city centre offices, prepared by the Cost Research and Engineering Services Departments at Davis Langdon & Everest. Assumes a category A fit-out standard.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS59893 (Browse shelf(Opens below)) | 1 | Available | 91074-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
An analysis of cost and specification information relating to mechanical and electrical installations for city centre offices, prepared by the Cost Research and Engineering Services Departments at Davis Langdon & Everest. Assumes a category A fit-out standard.