Image from Google Jackets

Deft of design

By: Language: English Series: Chartered Insurance Institute Journal ; January 1996, 24-25(2)Publication details: 1996Subject(s): Summary: Outlines the roles played by client, planning supervisor, designer, principal contractor and main contractor in applying the Construction Design and Management Regulations 1995 through the five stages of a construction project from feasibility to handing over to the client. Summarises the main objectives of the Project Health and Safety Plan, Project Health and Safety File, Pre-tender Health and Safety Plan and the Construction Phase and Health and Safety Plan.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS54274 (Browse shelf(Opens below)) 1 Available 9465-1001

Outlines the roles played by client, planning supervisor, designer, principal contractor and main contractor in applying the Construction Design and Management Regulations 1995 through the five stages of a construction project from feasibility to handing over to the client. Summarises the main objectives of the Project Health and Safety Plan, Project Health and Safety File, Pre-tender Health and Safety Plan and the Construction Phase and Health and Safety Plan.