Image from Google Jackets

Minor Works: a lump sum or fluctuating contract?

By: Language: English Series: Building Trades Journal ; 194(5726) 8 October 1987, 27(1)Publication details: 1987Subject(s): Summary: Examines the effect of deleting clause 4.6 in the absence of optional clause 4.5 in JCT 1980 Minor Works , which provides for limited price fluctuation during a building contract.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS38245 (Browse shelf(Opens below)) 1 Available 9494-1001

Examines the effect of deleting clause 4.6 in the absence of optional clause 4.5 in JCT 1980 Minor Works , which provides for limited price fluctuation during a building contract.