Image from Google Jackets

Production rates for international projects in Asia

By: Contributor(s): Series: Cost Engineering ; 41(8) August 1999, 38-44(7)Publication details: 1999Subject(s): Summary: Compares the labour needs for building construction in a developing country, Bangladesh, with those in a wealthy country, the US. The major costs of a construction project are linked to material, labour, and equipment.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS61326 (Browse shelf(Opens below)) 1 Available 100552-1001

Compares the labour needs for building construction in a developing country, Bangladesh, with those in a wealthy country, the US. The major costs of a construction project are linked to material, labour, and equipment.