A game of two halves.
Series: Building ; 64(8102) 3 September 1999, 55(1)Publication details: 1999Subject(s): Summary: Outlines the role of the specification writer in design & build projects. They need to both help the bidders understand what the client wants and to ensure that its needs are met within cost and time constraints.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS61171 (Browse shelf(Opens below)) | 1 | Available | 101761-1001 |
Outlines the role of the specification writer in design & build projects. They need to both help the bidders understand what the client wants and to ensure that its needs are met within cost and time constraints.